Engineering


RTU/SCADA Replacement
Year: 2011-2012
Location: Umm Shaif, Zakum(Offshore Platforms), U.A.E.
Contractor/End User: Caeme (CAE) / ADMA-OPCO



Project Scope

 Preparation of instrument index
 Preparation of instrument elevation plan
 Preparation of interlock logic diagrams
 Preparation of cable tray / cable trench layouts
 Preparation of junction box termination drawings
 Preparation of instrument hook up drawings
 Preparation of cable schedules
 Preparation of interface drawings for DCS, PLC, SCADA and MCC
 Preparation of as -built drawings and documentation
 Software used AutoCAD, INtools 2007




Pipe Route and Civil Drawings
Year: 2011
Location: Sugar Plant, Covai
Contractor/End User: Sakthi Sugar Ltd



Project Scope

 Piping material specifications
 3D model project set-up
 Painting and insulation specification
 Pipe supports
 Isometrics
 Piping general arrangement drawings
 Reinforced concrete framed structures
 Pile and conventional foundations
 Equipment and machinery foundations
 Concrete storage silos and large diameter storage tank foundations
 Retaining, dyke, and boundary walls




Piping Related Drawings
Year: 2010
Location: Organi Plant, Andrapradesh
Contractor/End User: DSE Pte Limited / Hindustan Organic Ltd,
Andrapradesh



Project Scope

 Review project specifications, administrative and technical practices, design instructions, plot plan, flow diagrams, and supplier information.
 Performs manual/computer layouts using specifications, standard drawings, design instructions, plot plan, flow diagrams, line list and supplier information.
 Draw and update material and stress sketches.
 Communicates and interfaces with other project design and engineering disciplines.
 Complete manual/computer drawings and isometrics.
 Check, back check, and correct manual/computer drawings and isometrics.
 Check other departments' design drawings and supplier equipment drawings.
 Update master flow diagrams.
 Software Used AutoCAD, Microstation.




GA & Isometric Drawings
Year: 2010
Location: Chemical Plant, Chennai
Contractor/End User: Phonics / AGRO Chemical Ltd, Chennai



Project Scope

 Preparation of bill of materials
 Material take off
 Pipe supports
 Isometrics
 Piping general arrangement drawings
 Piping material take-offs
 Support material take-off




Electrical & Instrumentation
Year: 2010-2011
Location: Power Plant, Chennai
Contractor/End User: GB Power Plant, Chennai



Project Scope

 Designing supply change over schemes for incomers and outgoing feeder control schemes
 Selection of feeder /motor / transformer protection relays
 Switchyard / transformer layouts, Switchgear / MCC room layout
 Battery room layouts, Cable tray / trench layouts
 Earthing layouts, Cable routing layouts
 Lighting (indoor/outdoor) layouts, Lightning protection layouts, Power and control cable schedules
 Preparation of project specification, Preparation of control philosophy
 Preparation of detailed execution drawings, Preparation of instrument index
 Preparation of instrument elevation plan, Preparation of interlock logic diagrams
 Preparation of cable tray / cable trench layouts, Preparation of junction box termination drawings
 Preparation of instrument hook up drawings, Preparation of cable schedules
 Preparation of fire and gas drawings, Preparation of cause and effect drawings
 Preparation of requisition and specifications for instruments
 Technical bid evaluation
 Review of vendor package systems
 Sizing of control valves, orifice plates, and relief valves




Telecom Tower Electrical & Civil Work
Year: 2008-2010
Location: Telecom Towers (12 Towers), Chennai Area
Contractor/End User: Phonics, KBS Contractors,
Ananth tube Industries / Indus Towers, Chennai



Project Scope

PIU assembling, Battery bank, Power Plant, TMR Rack fixing, Copper Plate (IGB 7& OGB) earthing including cutting and drilling, Outer are cables are covered with PVC pipe.

All equipment internal and outdoor connections, Lightning, arrestor, Lightning strip connection up to top of the tower, AVS Lamp Fixing & connections.

Copper Plate (IGB & OGB) earthing, outdoor cable tray welding and all equipments earthing, Earth Pipe (GI pipe with chamber construction) The Quick build Foundation is designed to accommodate.

Fast Erection of Towers and thereby rollouts.

Elimination of RCC related delays: Procurement, Shortages, theft, quality management.

Reduction of Risk of theft and general shortages at site.

Once the Quick build Foundation is assembled the tower can be erected immediately.

Quick Build Foundation Principle:

Dig Hole, Level the base, Place Plates, built lattice Foundation, Add platform, Excavation backfilled, Erect tower directly on lattice foundation one section at a time, add the ladder after each section is erected, add the platform, install antennas and MW, add the equipment and shelters on the platform, 11 days and complete.

Power Plant, Diesel Generator, PMU (Power Management Unit), Fire Alarm System, Battery System, Battery Bank, Air Conditioners, Shelters, Servo Stabilizers, SMPS, Tower/Mast/Pole, Earth Pits, Other Electrical Elements Operating Maintenance