Telecom Engineering
The company offers all types of Self Supported Lattice Towers: Angular, Tubular, Hybrid with 3 or 4 leg constructions for both Roof Top and Ground Based Installations in wind speeds from 140 Kmph to 200 Kmph. The tower heights are from 9 mtr to 100 mtrs. The company also offers towers as per customer designs/drawings. The towers are cost-effective and offer extended service life.
Design & Detail Engineering
Tower Design for Ground Based & Roof top Towers
Microwave tower, foundation design and detailing (Roof top / Ground based).
Design Checking & Strengthening analysis of existing towers.
Changing in antenna loading.
Change in wind pressure.
Change in design parameters.
Structure assembly drawing.
Fabrication drawings.
Piece / shop drawings.
Bill of materials.
Soil investigation reports verification and recommendations on type of generic design to be followed.
Telecom Infrastructure services
Collection of building details
Perform NDT (Non destructive test) to identify grade of concrete and reinforcement details
Corner cut to identify column reinforcement
Excavate to identify footing details and soil properties
Building stability analysis and checking for additional loading due to Roof Top tower, Shelter, DG & other equipment (using STAAD software)
Strengthening measures, in case the building is found to be unsafe
- Admixtures
Steel lugs and bracing
- Additional reinforcement
Issue of structural safety certificates
Preperation of structural drawings of existing buildings(if buiding structural drawings are not available)
Measure building & foundation dimensions
Structural drawings with physical dimensions & reinforcement details
Electrical Commissioning Work
Assembling Area
PIU assembling, Battery bank, Power Plant, TMR Rack fixing, Copper Plate (IGB 7& OGB) earthing including cutting and drilling, Outer are cables are covered with PVC pipe.
Electrical & Earthing
All equipment internal and outdoor connections, Lightning, arrestor, Lightning strip connection upto top of the tower, AVS Lamp Fixing & connections.
Copper Plate (IGB & OGB) earthing, Outdoor cable tray welding and all equipments earthing, Earth Pipe (GI pipe with chamber construction)
Civil Construction Work
The Quick build Foundation is designed to accomodate.
Fast Erection of Towers and therby rollouts.
Elimination of RCC related delays: Procurment, Shortages, theft, quality management.
Reduction of Risk of theft and general shortages at site.
Once the Quick build Foundation is assembled the tower can be erected immediately.
Quick Build Foundation Principle:
Dig Hole, Level the base, Place Plates, built latice Foundation, Add platform, Excavation backfilled, Erect tower directly on lattice foundation one section at a time, add the ladder after each section is erected, add the platform, install antennas and MW, add the equipment and shelters on the platform, 11 days and complete.
Operating Maintenance
Power Plant, Diesel Generator, PMU (Power Management Unit), Fire Alarm System, Battery System, Battery Bnak, Air Conditioners, Shelters, Servo Stabilizers, SMPS, Tower/Mast/Pole, Earth Pits, Other Electrical Elements.
Up Gradation Work
Shelter
PIU Upgradation (Swaping or Upgrading LCU), Power Plant, battery Bank, Fixing TMR Rack, Fixing DCDB, Fixing Battery Chiller, ROX tec cutting, fixing additional MCB with wiring, Shelter internal rewiring when needed, Dismentling cable from existing DG and reconnection, Terminating all alarms from PIU, PP to krone module.
Outdoor
PIU Upgradation (Swaping or Upgrading LCU), Power Plant, battery Bank, Fixing TMR Rack, Fixing DCDB, Fixing Battery Chiller, ROX tec cutting, fixing additional MCB with wiring, Shelter internal rewiring when needed, Dismentling cable from existing DG and reconnection, Terminating all alarms from PIU, PP to krone module.
Civil Work
Construction of DG bed, step for acccess ladder, Constructing earth pit chamber, terminating all alarms from PIU, Power plant to Krone module, laying shelter blocksfor cabinet expansion.
Highlights
Electrical Installation
Verifying Design Validity
Operating Maintenance